Deutsch Espanol Francais Italiano Portugues Japanese Korean Arabic Russian

concrete mxing plant knowledge

concrete batching plant transmission system inspection instructions

What are the inspection regulations for the transmission system of concrete mixing plant

1. The connection between the main motor and the planetary reduction mechanism (or cycloidal pin gear reducer, coupling and bridge gear to transmit power) shall be reliable, and the operation shall be stable without abnormal noise;

2. The safety hook and locking pin of the climbing track feeding mechanism shall be complete; The wear of upper hopper roller and transmission gear shall not exceed the requirements specified in the machine manual;

3. The transmission of bucket elevator and screw conveyor shall be stable without abnormal noise, leakage and cement accumulation;

4. The gear wear of the rotary mechanism of the dragline batching system shall be within the range specified in the manual of the machine, and the steel wire rope shall comply with the relevant provisions of this specification;

5. The belt conveyor of bin type batching system shall operate stably without deviation, slipping, abnormal noise, and the belt shall not be broken or cracked.


Scan the qr codeclose
the qr code